Optimal Timetabling With Connections In Underground Railway Systems
Price
Free (open access)
Transaction
Volume
20
Pages
10
Published
1996
Size
1,194 kb
Paper DOI
10.2495/CR960421
Copyright
WIT Press
Author(s)
R. Minciardf, M. Paolucci & R. Pesenti
Abstract
This paper investigates the problem of defining a timetable for the train runs in an underground railway network. The objective is to optimise the quality of the service offered to the customers. To this end a problem decomposition approach which favours the connections among the different lines is introduced. 1 Introduction The problem of producing daily timetables (also called train run schedules) for underground railway systems, generally involving several lines, is dealt with in this paper. Such a problem may be formalised by taking into account different objectives and constraints. In particular, the possible objectives
Keywords