Computer Aided Construction Of Timetables On Long Route Sections
Price
Free (open access)
Transaction
Volume
6
Pages
8
Published
1994
Size
627 kb
Paper DOI
10.2495/CR940051
Copyright
WIT Press
Author(s)
V. Klahn & H. Dannenberg
Abstract
In complex railway systems even small alterations to individual compo- nents can have wide repercussions. This makes computer-assist methods indispensable in both planning and operations control tasks. Especially the planning of timetables on long route sections will be much faster by com- putering those tasks, which currently still depends a lot on experience and intuition. For this purpose the interaktive construction programme SIMU- PLAN was developed on the basis of the simulations model SIMU VII at the Institute for Transport, Railway Construction and Operation (IVE) at Hannover University. 1 Model components SIMUPLAN is fitted into the data and programme environment of the si- mulation system SIMU VII (Klahn [2]). This minimizes the effort of data acquisation and also m
Keywords