WIT Press


Real-time ATO Reconfiguration For Operational Stability

Price

Free (open access)

Volume

135

Pages

11

Page Range

163 - 173

Published

2014

Size

449 kb

Paper DOI

10.2495/CR140131

Copyright

WIT Press

Author(s)

A. Iliasov, I. Lopatkin, A. Mihut & A. Romanovsky

Abstract

This paper briefly describes a technique for improving capacity and operational stability of busy mainline junctions and stations. The technique, called the SafeCap advisory system, employs a mixture of existing train monitoring and control technologies to introduce an advisory control layer on top of fixed-block signalling. We present the main design principles and illustrate the advantages of the proposed solution with some experiments conducted in a train simulation toolkit.

Keywords