An Intelligent Interactive Graphic-based System For Scheduling Multi-story Projects
Price
Free (open access)
Volume
6
Pages
9
Published
1994
Size
974 kb
Paper DOI
10.2495/AI940421
Copyright
WIT Press
Author(s)
W. Thabet, A. Morad & Y. Beliveau
Abstract
In any construction environment, the sequence of work is usually flexible enough to allow for different scenarios regarding the order of execution of the project activities. As a result, the scheduling process should allow for testing alternative sequences of activities before a final schedule is generated. This paper describes an intelligent interactive graphic-based system being developed to generate alternative schedules for multi-story projects. The proposed system is designed to utilize an initial linear schedule generated by an existing knowledge-based system. The proposed system will employ an intelligent approach that allows th
Keywords