WIT Press

An Intelligent Interactive Graphic-based System For Scheduling Multi-story Projects

Price

Free (open access)

Volume

6

Pages

9

Published

1994

Size

974 kb

Paper DOI

10.2495/AI940421

Copyright

WIT Press

Author(s)

W. Thabet, A. Morad & Y. Beliveau

Abstract

In any construction environment, the sequence of work is usually flexible enough to allow for different scenarios regarding the order of execution of the project activities. As a result, the scheduling process should allow for testing alternative sequences of activities before a final schedule is generated. This paper describes an intelligent interactive graphic-based system being developed to generate alternative schedules for multi-story projects. The proposed system is designed to utilize an initial linear schedule generated by an existing knowledge-based system. The proposed system will employ an intelligent approach that allows th

Keywords