Automatic Conflict Detection And Advanced Decision Support For Optimal Usage Of Railway Infrastructure: Prototyping And Test Results
Price
Free (open access)
Transaction
Volume
37
Pages
9
Published
1998
Size
624 kb
Paper DOI
10.2495/CR980861
Copyright
WIT Press
Author(s)
F. Makkinga & S. Metselaar
Abstract
The Netherlands Railways currently uses a computer-controlled route setting based on a route setting scheme. Route management has shifted from dispatching towards planning and supervising routes. Early conflict detection and decision support (CD/DS) is needed to support this new working method. The CD/DS system effectively adjusts the route setting scheme in advance when, for example, a delayed train will cause a conflict. This paper highlights prototyping results with this system, its architecture and purposes and results of real life tests. The tests were performed to ensure the feasibility, reliability and accuracy of train movement predictions and conflict detection. The purposes
Keywords