The Adtranz Communications And Control System - The Future On Board
Price
Free (open access)
Transaction
Volume
21
Pages
14
Published
1996
Size
1,417 kb
Paper DOI
10.2495/CR960322
Copyright
WIT Press
Author(s)
D. Huber
Abstract
New technologies like the Train Communication Network and the 32-bit technology have led to significant improvements in the traction control systems already existing within ABB Daimler-Benz Transportation. The new Adtranz Communication & Control (C&C) system consists of the so-called vehicle control units and powerful distributed I/O modules connected to the multifunction vehicle bus (MVB). The interface between the wire train bus (WTB) and the MVB is provided by the Adtranz TCN Gateway. Subsystems, like door control or brakes, are connected through MVB medium interface boards in an open manner in conformance with the TCN specifications. The new Adtranz C&C system will be introduced in a migrational way, based on the MICAS and TRACS syste
Keywords