ATACS (Advanced Train Administration And Communication System)
Price
Free (open access)
Transaction
Volume
21
Pages
7
Published
1996
Size
581 kb
Paper DOI
10.2495/CR960202
Copyright
WIT Press
Author(s)
T. Kobayashi, O. Iba, H. Inage & Y. Tateishi
Abstract
Track circuits and wayside signals have kept safety of railway system for a long time. With a help of this signaling system, we have improved safety and increased traffic volume. However, it is necessary to lay large amount of metallic cable along railroad. Initial cost and maintenance cost are extremely large in such a signaling system. Also, replacement of large amount of equipment is necessary at a system change. In order to avoid such unnecessary expense, we are now developing some new traffic control systems based on wireless communication system with a view to constructing a railway system toward the 21st century. We are developing a new system aiming at practical use in near future. This
Keywords