A Bi-objective Model For The Integrated Frequency-timetabling Problem
Price
Free (open access)
Transaction
Volume
138
Pages
11
Published
2014
Size
341 kb
Paper DOI
10.2495/UT140181
Copyright
WIT Press
Author(s)
P. A´ vila, F. Irarragorri & R. Caballero
Abstract
The urban transport planning process has four basic activities: network design, timetable construction, vehicle scheduling and crew scheduling. In this work we focus on the urban bus timetable construction problem which has two sub-activities: bus frequency calculation and bus departures setting. Typically, these sub-activities are done sequentially, which has some drawbacks: to overcome these drawback we propose to integrate both these sub-activities. We take into consideration: multiple planning periods, synchronizations events (a synchronization occurs when two buses from different routes arrive to a node within a time window), fixed and variable operations costs and uncertain demand in each period.
Keywords
frequency, timetable, integrated, fuzzy logic, multiperiod.