Water Surface Profiles And Scour Analysis For A River Reach With Multiple Bridge Proposals
Price
Free (open access)
Transaction
Volume
26
Pages
9
Published
1998
Size
925 kb
Paper DOI
10.2495/HY980191
Copyright
WIT Press
Author(s)
C.C. Nuthmann & C.C. Chang
Abstract
The Route 146 Project in the City of Worcester and the Town of Millbury, Massachusetts, USA. will replace 6.8 miles of two lane arterial roadway with a grade separated six lane freeway. The new highway parallels the course of the Blackstone River system. Crossing roadways and numerous interchange ramps impact the river and the floodplain. A total of fourteen new river bridges will be constructed, and eleven old river bridges will be demolished. Construction will be staged in phases over a period of eight years. Detailed hydrologic and hydraulic studies were performed to meet environmental
Keywords