WIT Press


Re-evaluation Of Multi-purpose Reservoir Yield

Price

Free (open access)

Volume

175

Pages

10

Page Range

283 - 292

Published

2013

Size

527 kb

Paper DOI

10.2495/ECO130241

Copyright

WIT Press

Author(s)

M. Yu, D. Lee, J. Yi & T. Kwon

Abstract

For a basin with existing reservoirs, the necessity of additional water demands as well as a re-evaluation of existing reservoir yield has been proposed. The objective of this study is to re-evaluate a multipurpose reservoir yield and to assess the possibility of additional water supply according to increase of downstream water demands. Andong and Imha reservoirs are selected for reevaluation. The standard reservoir operation rule model and the HEC-ResSim model were used for reservoir simulation for 30 years (1979–2008). In this study, water supply reliability was set up as 96.7% and 95.0% with yearly and monthly evaluation. In the case of 95.0% water supply reliability with yearly evaluation, water supply capability of Andong reservoir was evaluated as 893MCM and water supply capability of Imha reservoir was evaluated as 382MCM, and that results showed that water yields for both reservoirs are less than the original designed yields. Keywords: firm yield, reliability, water supply safety, water supply capacity.

Keywords

Keywords: firm yield, reliability, water supply safety, water supply capacity.